HAZARD AND RISK MANAGEMENT
Risk Assessment
-
Risks are to be systematically assessed by undertaking a risk assessment (i.e. Critical Risk Assessment Workshop [CRAW], Safe Work Method Statement [SWMS], Job Hazard Analysis [JHA], Take-5).
-
​All identified hazards and risks are recorded in the relevant Site / Project specific Risk Register.
-
IES rates the risks of workplace hazards using the Risk Matrix (IES-BS-IMS-SWI309).
-
As a minimum all work is required to be risk assessed using a personal situational risk assessment (e.g. Take-5).
-
This Matrix ensures the consequence of hazards, the likelihood they will occur and the overall risk rating to prioritise control is determined consistently.