top of page
5.png

HAZARD AND RISK MANAGEMENT

Risk Assessment

  • Risks are to be systematically assessed by undertaking a risk assessment (i.e. Critical Risk Assessment Workshop [CRAW], Safe Work Method Statement [SWMS], Job Hazard Analysis [JHA], Take-5).

  • ​All identified hazards and risks are recorded in the relevant Site / Project specific Risk Register.

  • As a minimum all work is required to be risk assessed using a personal situational risk assessment (e.g. Take-5).

IES-BS-IMS-PRE346 Corporate HSEQ Induction

image.png
bottom of page